Civil, Structural and Architectural Engineering Consultancy in UAE and the region
Welcome to INTEGRA CONSULTING SERVICES, where architectural brilliance and engineering innovation converge to deliver exceptional design solutions tailored to meet your unique needs.
Designs that merge functionality with cultural relevance for the Middle East.
Cost-effective, high quality solutions without compromising aesthetics.
Advanced technology meets global standards for sustainable results.
Delivery visions with precision, efficiency, and community impact.
Discover how INTEGRA CONSULTING SERVICES can redefine the future of your projects and leave a lasting impression on the built environment. We invite you to explore our profile and learn more about our passion for delivering excellence in every endeavor.
Discover how INTEGRA CONSULTING SERVICES can redefine the future of your projects and leave a lasting impression on the built environment. We invite you to explore our profile and learn more about our passion for delivering excellence in every endeavor.
Engineering and Design
Provided Engineering Consultancy with a team of engineers to do C&S Detailed Design And detailing followed by construction superivison of the foundations, sub-structure basement and 43 & 46 level superstructure.
3rd Party Checking of C&S Design and Engineering
Provided 3rd Party Review (Accredited Checker – AC) for 20 buildings over JLT , Dubai in 2008-2010 period during construction to ensure value engineering, safety, and structural elements are robust
Cross Island Regional Line (CRL) is a Underground MRT train infrastructure with a full integrated station, new cut and cover tunnel and a section of tunnel boring machine (TBM), and Addition and Alteration works to the existing above ground station at Pasir Ris region in Singapore. The Construction cost is SGD 1 Billion Dollars. Integra Consulting was involved in the temporary works design and risk mangement and risk register from the start of the project to present.
J120 is a 2 block high rise building in the central region of Jurong, with 2 basements and 29 storey superstructure around existing buildings and existing MRT viaducts. The challenge was to build it in a very highly dense environment. The 2 blocks are connected via a skybridge launched from one side Integra was involved in the temporary works design, risk and safety management, and construction sequence advisory role.